Solar in Perth new housing estates: what to know before you build

Building in Alkimos, Ellenbrook, Baldivis or another Perth growth corridor? Builder solar packages, estate covenants, Western Power timing and export limits can all shape your system.

By BillWise TeamFiled 19 June 2026Updated 15 Oct 20265 min read

Putting solar on a brand-new home isn't quite the same as adding it to an old one. Your builder may offer a package, your estate may have rules about where panels can go, and Western Power may not have switched on your street yet. None of it is hard to sort out, but it's far easier to ask before you sign than after the slab is down.

What does a builder's solar package usually include?

Many Perth volume builders offer solar as a standard inclusion or a low-cost upgrade, especially in the growth corridors around Alkimos, Yanchep, Ellenbrook, Baldivis, Byford, Harrisdale and south Canning Vale. Expect an entry-level system, generic or mid-range panels, and a standard string inverter. That's the unit that turns panel power into power your home can use. System sizes vary by builder.

On the plus side, the cost rolls into your construction loan, so you pay home loan interest rather than personal loan rates. Conduit goes in before the slab is poured, which saves retrofit work later. And in many estates the builder handles the Western Power network connection notice (NCN) as part of construction approval, so you skip a separate wait.

The catch: it's harder to compare specs or swap brands, and packages are often priced above what a direct installer would charge. Quality and warranty handling vary a lot between builders too. So ask an installer accredited by Solar Accreditation Australia (SAA) to quote the same specification, then compare it with the builder's number. Factor in the loan difference as well: a construction loan and a solar loan after the build don't cost the same to carry.

Can an estate covenant stop you installing solar?

Some can. Many newer estates use design covenants, which are legal rules written into the land title about how homes look, and they can catch solar buyers out. You might find a rule against visible roof-mounted equipment from the main street, a limit on roof colours that doesn't suit dark panels, or a ban on ground-mounted structures in the front setback.

You'll find the covenants in the land title documents, in a registered deed of restrictions. Your conveyancer, the professional who handles the property transfer, will check them at settlement, but that's late. Ask about solar before you buy the lot. Older estates are more likely to restrict it, and plenty of developers have loosened their rules over time, so read the covenant for your actual lot rather than assuming.

How long can the Western Power connection take?

In fast-growing corridors, network capacity can lag behind building timelines. Your panels can't connect to the grid until Western Power has commissioned (switched on) the network in your street, and in some new estates homeowners can wait months after the build for that to happen. You can still have the panels installed. You just can't export, or earn DEBS credits, until the connection is live.

So ask the developer what the commissioning status is for your stage. A stage with the infrastructure already switched on carries less risk than one where substation or transformer work is still going.

Will there be an export limit?

Possibly, and it's worth knowing before you pick a system size. For new or upgraded systems, the system must be able to be disconnected remotely (a 1 May 2026 rule), or else you are held to a fixed 1.5 kW export limit. A home on the fixed limit misses out on DEBS credits.

Some new estates may also carry tighter local limits, which would show up on your NCN approval. Your installer can look up the limit for your lot. If it's low, a bigger system adds less than you'd hope, because extra panels only produce power you can't send to the grid. You'd still use that power in the house as normal.

Should you put EV charging conduit in during construction?

Yes, if you can. It's usually the cheapest moment, since the walls are open. Ask your builder whether conduit from the switchboard to the garage is included, and whether it's recorded on the electrical certificate. While you're at it, think about conduit for the roof-to-switchboard run (if the solar package doesn't already include it), a future battery, and a second EV charger. Running conduit after the build can mean chasing walls or running it on the outside, which costs a good deal more. Ask your installer for numbers.

Does the way the house faces matter?

It does. A north-facing roof gives Perth's strongest solar output, east and west roofs produce somewhat less across the year, and a south-facing roof produces significantly less. That matters most when you're choosing a lot, so check the street direction and the builder's floor plan orientation before you commit. If your main roof will face east or west, ask the builder about tilted north-facing panels during the design phase, while changes are still cheap.

If you'd like to see what solar might do for a new home, the BillWise savings calculator lets you test system sizes against your expected usage.

$Found this helpful? Share it!

Money-relevant figures in this article are checked against primary sources. Here’s how we check our facts.

Run your own numbers

Calculate your savings

See how much you could save with solar, batteries, and smart tariff choices

Related guides

Related articles

AC coupling vs DC coupling for solar batteries in Perth: what the difference means for you

Solar6 min read
Read →

Adding more solar panels to an existing system in Perth

Solar9 min read
Read →

All-black solar panels in Perth: aesthetics, cost, and performance difference

Solar6 min read
Read →

With your OK we use Google Analytics and Google Ads cookies, Vercel visit statistics, masked session recordings to find bugs, Microsoft Clarity recordings and heatmaps of how pages are used, and an anonymous copy of your calculator figures for local averages. None of it runs unless you accept.